Our Work

Our reputation for integrity and the respect we have gained means we are a growing business, thriving on personal recommendations from our loyal clients and trusted industry colleagues. Our team of town planning consultants deal with a host of interesting planning projects from across southern England and Wales.

Take a look at a few examples of our work

Team members gathered around a laptop

Replacement Dwelling Secured in the Green Belt and Cotswolds National Landscape

McLoughlin Planning has successfully obtained planning permission to demolish an existing dwelling and construct a larger replacement dwelling in the Tewkesbury Borough.  The siteโ€™s location within the Cotswolds National Landscape (formerly the Cotswolds Area of Outstanding Natural Beauty) and particularly the Gloucester-Cheltenham Green Belt presented significant challenges to achieving the client brief. In partnership with Coombes:Everitt Architects and Willder Ecology โ€“we secured the demolition of a dilapidated dwelling dating from the 1920s, and the construction of a larger contemporary replacement dwelling.

Defining the term โ€˜materially largerโ€™ in the Green Belt?  A holistic comparison can be key

Councils often provide inconsistent guidance or, more challenging still, no guidance at all in terms of the size of a replacement building one is allowed to construct in the Green Belt. The key planning policy test for this application was that the new dwelling could not be โ€œmaterially largerโ€ than the existing dwelling, which inevitably raised the question: what is meant by this subjective term?

McLoughlin Planning successfully negotiated with the case officer to agree that the proposed dwelling was not materially larger, thus allowing planning permission to be granted. One of the key lessons learnt from this project is that it is not simply a question of comparing the existing and proposed floor areas. The Council will also take into consideration the differences in height, footprint, and volume, in addition to floor area, when deciding whether a replacement building is โ€œmaterially largerโ€. Providing a holistic comparison can be the difference between approval and refusal.

I own a property in the Green Belt โ€“ how can I obtain planning permission for my project?

We are absolutely delighted with the positive outcome on this project, which will turn an almost unusable dwelling into a well-designed home.  The team at McLoughlin Planning are very experienced in the nuances surrounding these types of development projects and navigating the complexities of challenging land designations.   If you have a project that might benefit from our expertise, then get in contact with one of our planning consultants to find out how we can best assist you.

 

Joe Seymour โ€“ Associate Director

E: joe.seymour@mplanning.co.uk

T: 01242895008

 

Image source: Coombes: Everitt Architects (2024)

Project Team:

McLoughlin Planning (Planning consultants)

Coombes:Everitt architects (Architects)

Willder Ecology (Ecologist)

Find out more

Planning Success for a New Dwelling in Stow-on-the-Wold Town Centre

We are delighted to confirm that McLoughlin Planning was instrumental in obtaining planning permission for the change of use of a Bed & Breakfast (Use Class C1) into a new dwelling (Use Class C3).    

Securing a residential use in a town centre location 

The proposed change of use raised a number of key planning considerations which had to be carefully navigated, as the 18th century property is situated in a Conservation Area and within the Cotswold National Landscape.   

But the main planning issue was related to the Principle of Development, given the propertyโ€™s location in Stowโ€™s defined town centre. This area is zoned for commercial uses, meaning new residential development is not usually supported. Despite this constraint, McLoughlin Planning was able to persuade Cotswold District Council that in this case, a residential use in the town centre was appropriate.  

Our pragmatic approach, nuanced analysis of policy and site context, and the presentation of a strong fall-back position secured the planning approval for this change of use and the further evolution of this historic building, which will now become a family home.  

Moving towards a mixed-use High Street? 

Councils tend to have policies prohibiting new dwellings in town centre locations, mainly to ensure the โ€˜vitality and viabilityโ€™ of the High Street is maintained. However, applications like this demonstrate it is possible to obtain permission for a dwelling in commercial centres. As our High Streets evolve, there is increasing recognition that the introduction of modest amounts of residential uses within town centres can contribute to, rather than diminish, the activity in town centres.  

How we can help 

Do you own or are you interested in purchasing commercial property in a town centre with a view to changing its use to residential? If so, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below. 

Joe Seymour โ€“ Associate Director 

E: joe.seymour@mplanning.co.uk 

T: 01242895008 

Image source: Knight Frank Estate Agency

Find out more

Planning secured for 2x family homes near Cirencester following successful Permission in Principle application

McLoughlin Planning has successfully secured Technical Details Consent (TDC) to construct 2 x 4-bed dwellings in the village of Driffield, a non-principal settlement near Cirencester. This is following the successful grant of Permission in Principle (PiP) at Cotswold District Councilโ€™s Planning Committee.

What is Permission in Principle (PiP)?

Permission in Principle is a planning consent route which was introduced in 2018.  It is an alternative way of obtaining planning permission for housing-led development and it separates the consideration of matters of principle for proposed development (location, uses and amount of development), from the technical detail of the of the development (everything else, including planning conditions, s.106 and BNG).

The PiP stage acts like a watered-down outline planning application, and it can prove a useful tool if you want to get a clearer idea of whether development on site may be acceptable in principle, without the need for submitting costly reports from the outset.

The Technical Details Consent is more akin to a full planning application and as such, requires the submission of detailed reports, including full details of layout, scale, landscaping, appearance, and access.

Technical Details Consent (TDC) and Biodiversity Net Gain (BNG)

The most notable aspect of this TDC approval is that off-site Biodiversity Net Gain (BNG) credits needed to be sourced from a third-party organisation. This is because the site was not large enough to achieve the statutory 10% BNG uplift within the site boundary. Once a quote for off-site BNG credits was obtained, this was enough for the Council to grant planning permission, subject to an informative stating that development cannot commence until a BNG Plan has been submitted to and approved by the Council.

This will now be commonplace for small-scale housebuilders and developers as the sites they typically develop will not be large enough to construct dwelling(s) and have sufficient residual space to achieve a 10% BNG uplift on site. Therefore, sourcing off-site BNG credits is now becoming an essential part of obtaining planning permission.

How we can help

Are you looking to obtain planning permission for small-scale residential development? Do you need to source off-site BNG credits for your development? If so, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below.

Joe Seymour โ€“ Associate Director

E:  joe.seymour@mplanning.co.uk

T: 01242 895 121

Project team

  • K-Ten Consulting (Drainage)
  • All Ecology (Ecology)
  • Wotton Tree Consultancy (Arboriculture)
  • Core Geotechnics Ltd (Geology)
  • Andrew P Jones (Development Consultants)

Image Source: Andrew P Jones Associates

 

About us

We are McLoughlin Planning, and our team has a simple objective: to get results for our clients by providing high quality planning consultancy.

Our reputation for integrity, innovation and intelligence means we are a growing business, thriving on personal recommendations from our loyal clients and trusted industry colleagues. Our team of chartered town planning consultants deal with a host of interesting planning projects from across southern England and Wales โ€“ from strategic promotions and commercial premises to private developments and rural projects.

We are a friendly and approachable team who care passionately about the built environment, always striving to get the best outcome for our clients and the community.

Please view our full โ€˜About Usโ€™ page to view which of our planning consultants would best fit your needs.

Find out more

Planning success for state-of-the-art, 66-bed care home in Brockworth, Gloucester

It was an absolute pleasure to be part of this proposal in Brockworth for a three-storey, 66-bed care home facility, along with associated ancillary works. Planning was approved in February of this year.  

The planning balance โ€“ increase in built form outside the settlement boundary VS identified need for housing

The site comprised a single dwelling in ample grounds, surrounded by playing fields and residential gardens with established border treatments.  

Key planning considerations included:  

  • The siteโ€™s location outside the settlement boundary; 
  • The introduction of a larger built form compared to the buildings currently on site; 
  • Access; 
  • Design and layout; 
  • Landscaping and trees;  
  • BNG; 
  • Archaeology;  
  • Energy Strategy. 

Although outside the settlement boundary for Brockworth, the development site benefitted from being adjacent to a strategic allocation, outlined in the Gloucester, Cheltenham and Tewkesbury Joint Core Strategy 2011-2031.  Furthermore, at the time of submission, the Council could not demonstrate a five-year housing land supply. The proposal would therefore help to address the identified need for registered care beds in the locality, and the quantum proposed would make a useful addition to the Councilโ€™s housing supply figures. 

Regarding the increase in built form compared to the existing, whilst this undoubtedly represented a key planning issue, it was successfully evidenced that the scheme could be delivered without unacceptable wider landscape and visual impacts, particularly given the significant additional residential development taking place adjacent to the site. As a result, we successfully justified that the minor visual harm created by the new built form would be comprehensively outweighed by the substantial benefits that would result from the development. 

The importance of communication and collaboration during the planning application process

Given this, a positive pre-application response was received, which acknowledged that the principle of development was acceptable, along with the proposed quantum of development which initially sought an 82-bed care home with associated amenity space, parking provision and a revised access point.   

On this basis, working effectively across a multi-disciplinary project team, a full planning application was submitted. However, statutory consultee responses received during the determination period raised several concerns.  We liaised effectively with the case officer and wider project team, presenting a series of solutions and mitigation measures to assuage concerns and present a scheme which responded positively to statutory responses and ensured a suitable quantum of care provision, adhering to the vision of our client.   

These included:  

  • Reduction in the size of the proposed Care Home to 66 beds; 
  • Revised and reduced building layout  set further back into the site; 
  • Revised parking area to provide a higher proportion of spaces per unit; 
  • Biodiversity Net Gain (BNG) Assessment which demonstrated that a 24.88% BNG would be achieved, far in excess of policy requirements; 
  • Landscape Strategy Plan showing how the BNG will be achieved; 
  • Archaeological Evaluation Report and Trial Trenching results; 
  • Updated Sustainability and Energy Statement confirming that up to 90% of all the care homeโ€™s energy requirements woudl come from renewable energy sources; 
  • Waste Minimisation Statement to ensure the development is carried out in an as environmentally friendly way as possible. 

The application was decided at Planning Committee, and we are delighted that following our involvement, all concerns raised by the statutory consultees were successfully resolved and that planning was approved in a timely manner.    

How we can help

We are McLoughlin Planning, and our team has a simple objective: to get results for our clients by providing high quality planning consultancy. 

Our team of chartered town planning consultants deal with a host of interesting planning projects from across southern England and Wales โ€“ from strategic promotions and commercial premises to private developments and rural projects. 

We are a friendly and approachable team who care passionately about the built environment, always striving to get the best outcome for our clients and the community. 

If you have a development project which would benefit from expert planning consultancy input, then feel free to contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below. 

Joe Seymour โ€“ Associate Director 

E:  joe.seymour@mplanning.co.uk 

T: 01242 895 121 

Project team:  

  • Supporting plans by RDT 
  • Landscape and Visual Appraisal by David Archer Associates 
  • Design and Access Statement by RDT 
  • Transport Statement by RGP 
  • Heritage Statement by Orion 
  • Arboriculture Impact Assessment by David Archer Associates 
  • Ecological Report by Ecology Solutions 
  • Housing Needs Assessment by HPC 
  • Acoustics by Sharpes Redmore 
  • FRA & Drainage by PJA 

Image source: LNT Construction 

Find out more

Repurpose of Church grounds

We have recently been successful on application in using PiP to secure Permission in Principle for up to 5 dwellings on the site of a 1960s building last used as a Catholic Church.

Despite the site being located within the settlement boundary for Bourton-on-the-Water, McLoughlin Planning were initially met with resistance from Cotswold District Council to the prospect of redeveloping the brownfield site for a residential use. The building was previously used by the Diocese of Clifton for Catholic services, these were now mainly being conducted from their church in Stow-on-the-Wold, which meant the site was surplus to requirements.

Being faced with a refusal, McLoughlin Planning had to provide additional justification to comply with Policy INF2 which governs the redevelopment of community facilities such as places of worship. We explained that not only was there a suitable alternative venue in a nearby settlement that was more popular with the churchโ€™s congregation, but there are similar community facilities in the same planning use class within Bourton-on-the-Water that could perform the same services.

The Council requested a marketing exercise to prove there was no demand for the use of the site, however we successfully argued that this was not a policy requirement, because this only applied to the loss of a shop or pub. Consequently, McLoughlin Planning was able to demonstrate full compliance with Policy INF2 and the application was subsequently permitted.

This example further serves to demonstrate the usefulness of PiP Applications for private clients in providing highly cost-effective solutions to determine the development potential of their land and secure an uplift in value.

If this were a conventional outline or detailed application, upfront costs would have been considerably higher, reflecting the need for more technical work. Whereas, with the PiP process, the costs are largely focused on the planning case for the development, allowing significant savings to be made.

Find out more

About us

We have a simple objective: to get results for our clients by providing high quality planning consultancy. That means our goal is to secure planning permission or an allocation for development.

Get in touch

If you are interested in finding out how we can help you please get in touch