Our Work

Our reputation for integrity and the respect we have gained means we are a growing business, thriving on personal recommendations from our loyal clients and trusted industry colleagues. Our team of town planning consultants deal with a host of interesting planning projects from across southern England and Wales.

Take a look at a few examples of our work

Team members gathered around a laptop

400 Homes in Elland

McLoughlin Planning has had recent success in promoting land for 400 homes in the green belt at Elland in Calderdale Borough. For the past three years, the Local Plan has been at Examination, where we have made the case for the allocation of the site for housing and its release from the green belt. Last week, the Local Plan Inspector confirmed that the site should be allocated for development in her recommendations to the Council.

The history of the Calderdale Local Plan is complex, being one of the last Local Plans to be examined under the 2012 NPPF. These Plans were reliant on Strategic Housing Market Assessment (SHMA) to calculate the Local Planโ€™s overall housing requirements.

At the Regulation 18 stage, we successfully secured the allocation of the site in the Plan as part of the Plan meeting its SHMA housing requirement. Unfortunately, Council Members decided to removed the site from the Regulation 19 version of the Plan as they sought a lower housing target, ignoring the findings of their own SHMA.

Presenting evidence to the Examination, we were able to demonstrate the case that the Regulation 19 version of the Plan did not meet the requirements of the 2021 Framework. The Inspector agreed with our arguments and directed the Council to revert back to the Regulation 18 version of the Plan in terms of providing a higher housing target and re-allocating the site for development.

This success is the result of many years of perseverance, first working with the landowner in 2015 and then subsequently with Avant Homes. As part of our wider work, we have been responsible for assembling and managing a team of consultants to produce a Site Promotion Document, undertake EIA Screening and engaging with the Council on pre-application advice. We are currently advising on detailed layout matters with a view to submitting a planning application later in 2022.

Find out more

First Permission in Principle in the London Borough of Sutton Secured for 9 Flats

McLoughlin Planning is pleased to have helped a property owner secure Permission in Principle (PiP) with the London Borough of Sutton for an upward extension (airspace) development for 9 new flats. This is the first approved Permission in Principle granted by this London Borough.

Due to the significant number of reports and plans required through validation for full planning permissions, we have been approached by SME developers to find a means of managing development risk and to ensure the principle of their aspirations is something which can be agreed with the Council before investing in the technical work required. This is particularly applicable to constrained inner-city urban development sites where upward extensions for airspace development can be met with resistance.

Following previous success in London in using Permission in Principle, we worked with the landowner to develop a scheme which could be presented through a PiP to secure the principle of airspace development for the property. As this application type considers only the location, land use and amount of development, the level of supporting information is a fraction of a full planning permission. Whilst it does not remove the considerations and risks of subsequent technical considerations, it does provide an opportunity to agree with the Council whether the amount (i.e. number of residential flats) and location of the airspace development is acceptable. As PiPโ€™s are limited to up to 9 residential units, this type of proposal is ideally suited for smaller development proposals in urban areas.

Following submission, McLoughlin Planning worked closely with the Council and case officer to ensure the proposal was being determined correctly and to agree with the officer on the appropriate amount of development which would be realistic to approve for further technical consent.

We are so pleased to have helped provide the landowner with reassurance through the PiP of their propertyโ€™s development potential and to secure another first with a London Borough.

๐Ÿ“ž If you would like a FREE initial consultation call to explore whether your property could benefit from PiP, then please get in touch!

 

Chris Moore,

chris.moore@mplanning.co.uk

01242 895008

Find out more

Planning Permission Granted for Two-Storey Front Extension & Single-Storey Rear Extension in a London Conservation Area

McLoughlin Planning is pleased to have assisted in securing a householder Planning Permission for extensions and alterations to a family home in Camden, London.

 

Previous experience works in our favour for London build extensions

McLoughlin Planning was approached after the submission of a householder planning application with the London Borough of Camden. The architecture firm, Simon Miller Architects, who we worked with on this project, received correspondence from the assigned case officer, who raised concerns about elements of the proposal to extend the family home and wanted to provide additional space to the rear and convert a ground floor garage to provide an additional internal living space.

 

New planning Administration Approach? We are here to help!

Due to a recent change to Camdenโ€™s internal planning application management policy, applicants are being advised that they will get one opportunity to submit corrections (if the Camden Council considers a route forward can be agreed) before a decision is issued. Negotiations and contact with CamdenCouncilโ€™s planning officers are also limited because of this new policy. Therefore, the scope for engagement and agreeing on a way forward is heavily constrained.

 

Letโ€™s go back to the beginning โ€“ reviewing existing plans and sourcing relevant policiesequals planning permission granted!

 

Working from the email feedback provided, we reviewed it against the relevant Local Plan policies and provided the architect with feedback on how to amend the proposal and a supporting letter offering further policy justification and feedback to the planning officer to assist in revisiting the plans. Following the submission of this additional information, we then helped the architect and applicant with further correspondence with the Council and a review of proposed draft planning conditions provided by the planning officer before the Decision Notice was issued.

 

By assisting through the later part of the management of the application, we are pleased that a positive outcome could be reached and Planning Permission granted.

 

Seek planning advice for a smooth sail application process

 

The above application is a reminder that seeking planning advice before submission can help to manage the need for potential amendments, particularly where Local Planning Authorities are adopting a โ€œno negotiationโ€ or โ€œlimited submitted amendmentsโ€ policy. However, our flexible working approach means that should you need input or advice from one of our planning professionals during your planning application, then please do not hesitate to contact us below:

 

Chris Moore โ€“ Director

T: 01242895008

E: chris.moore@mplanning.co.uk

Find out more

Replacement Dwelling Secured in the Green Belt and Cotswolds National Landscape

McLoughlin Planning has successfully obtained planning permission to demolish an existing dwelling and construct a larger replacement dwelling in the Tewkesbury Borough.  The siteโ€™s location within the Cotswolds National Landscape (formerly the Cotswolds Area of Outstanding Natural Beauty) and particularly the Gloucester-Cheltenham Green Belt presented significant challenges to achieving the client brief. In partnership with Coombes:Everitt Architects and Willder Ecology โ€“we secured the demolition of a dilapidated dwelling dating from the 1920s, and the construction of a larger contemporary replacement dwelling.

Defining the term โ€˜materially largerโ€™ in the Green Belt?  A holistic comparison can be key

Councils often provide inconsistent guidance or, more challenging still, no guidance at all in terms of the size of a replacement building one is allowed to construct in the Green Belt. The key planning policy test for this application was that the new dwelling could not be โ€œmaterially largerโ€ than the existing dwelling, which inevitably raised the question: what is meant by this subjective term?

McLoughlin Planning successfully negotiated with the case officer to agree that the proposed dwelling was not materially larger, thus allowing planning permission to be granted. One of the key lessons learnt from this project is that it is not simply a question of comparing the existing and proposed floor areas. The Council will also take into consideration the differences in height, footprint, and volume, in addition to floor area, when deciding whether a replacement building is โ€œmaterially largerโ€. Providing a holistic comparison can be the difference between approval and refusal.

I own a property in the Green Belt โ€“ how can I obtain planning permission for my project?

We are absolutely delighted with the positive outcome on this project, which will turn an almost unusable dwelling into a well-designed home.  The team at McLoughlin Planning are very experienced in the nuances surrounding these types of development projects and navigating the complexities of challenging land designations.   If you have a project that might benefit from our expertise, then get in contact with one of our planning consultants to find out how we can best assist you.

 

Joe Seymour โ€“ Associate Director

E: joe.seymour@mplanning.co.uk

T: 01242895008

 

Image source: Coombes: Everitt Architects (2024)

Project Team:

McLoughlin Planning (Planning consultants)

Coombes:Everitt architects (Architects)

Willder Ecology (Ecologist)

Find out more

Planning success for garage conversion at a mews property in RBKC Conservation Area

We are delighted that following our involvement, planning permission has been secured for a garage conversion to enlarge the habitable living space of a mews house in the Royal Borough of Kensington and Chelsea (RBKC), despite a historic refusal on site for a similar scheme. The result of our recent planning approval will be the creation of a more spacious family home in a central and sustainable location, whilst also future proofing the building through important renovation works.

When a second opinion counts in planning

Our team was initially approached to assist following a planning refusal by RBKC for a similar scheme.  The key concerns raised by the Local Planning Authority (LPA) related to:

  • The impact of the proposed design on the conservation area;
  • Loss of car parking through the garage conversion and the subsequent additional on-street parking pressures.

As the property was centrally located in London, existing data advised us that surrounding streets were already heavily subscribed with parking permits and therefore could not afford the additional pressures. Furthermore, whilst garage conversions can, in some instances, be undertaken without the need for planning permission, a historic planning condition on the Mews property prevented the occupiers from benefiting from this opportunity.

Following a detailed review of the project, the previous refusal, the siteโ€™s context, and the relevant policies in the new Local Plan, we felt that there would be merit in revisiting the scheme and prepared a planning strategy for moving the project forward.

Turning a planning refusal into an approval โ€“ collaboration is key

Given the sensitive nature of the site, we worked closely with the team at Haine & Co Architects, to ensure that the revised design responded to the concerns raised in the previous planning refusal. The updated design sought to create a development which would be architecturally sympathetic to the age and character of the host building- reinforcing the original integrity of the site and its environs which was praised in the Officerโ€™s Report.  Furthermore, the additional space at the property would allow for a more comfortable living space and would make best use of the existing footprint.

Regarding the parking issues, we prepared and presented a case to the LPA that a Section 106 legal agreement could be used to make the development โ€œcar-freeโ€, given the siteโ€™s highly sustainable location. This would assuage concerns over additional pressures to on-street parking in the vicinity.

Following submission of the application, we liaised regularly with the case officer, ensuring they had everything they needed to make a timely determination. Upon completion of the legal agreement, the Council acknowledged that the previous reasons for refusal had been overcome and that Planning Permission could now be granted.

The importance of a strategic planning approach  

The above case is a useful reminder that a planning refusal does not necessarily mean that your development aspirations must come to a halt. Indeed, a refusal can help your proposals evolve, especially when combined with a strategic planning approach.

If you have recently had a planning refusal and would like a member of our team to review your case and explore whether there is a way forward to secure planning approval for your project, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below:

Chris Moore โ€“ Director

T: 01242895008

E: chris.moore@mplanning.co.uk

 

 

 

 

 

Find out more

Planning Success for a New Dwelling in Stow-on-the-Wold Town Centre

We are delighted to confirm that McLoughlin Planning was instrumental in obtaining planning permission for the change of use of a Bed & Breakfast (Use Class C1) into a new dwelling (Use Class C3).    

Securing a residential use in a town centre location 

The proposed change of use raised a number of key planning considerations which had to be carefully navigated, as the 18th century property is situated in a Conservation Area and within the Cotswold National Landscape.   

But the main planning issue was related to the Principle of Development, given the propertyโ€™s location in Stowโ€™s defined town centre. This area is zoned for commercial uses, meaning new residential development is not usually supported. Despite this constraint, McLoughlin Planning was able to persuade Cotswold District Council that in this case, a residential use in the town centre was appropriate.  

Our pragmatic approach, nuanced analysis of policy and site context, and the presentation of a strong fall-back position secured the planning approval for this change of use and the further evolution of this historic building, which will now become a family home.  

Moving towards a mixed-use High Street? 

Councils tend to have policies prohibiting new dwellings in town centre locations, mainly to ensure the โ€˜vitality and viabilityโ€™ of the High Street is maintained. However, applications like this demonstrate it is possible to obtain permission for a dwelling in commercial centres. As our High Streets evolve, there is increasing recognition that the introduction of modest amounts of residential uses within town centres can contribute to, rather than diminish, the activity in town centres.  

How we can help 

Do you own or are you interested in purchasing commercial property in a town centre with a view to changing its use to residential? If so, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below. 

Joe Seymour โ€“ Associate Director 

E: joe.seymour@mplanning.co.uk 

T: 01242895008 

Image source: Knight Frank Estate Agency

Find out more

Regeneration of a brownfield site into 6 new homes in the Forest of Dean

We are delighted that following our involvement, planning permission has been secured for the erection of six new apartments in the heart of Cinderford.

Identifying the development potential of brownfield land   

It was an interesting site, located within the development boundary of Cinderford and previously associated with commercial uses.  But it was also an irregular shape, bounded by commercial and residential units, and had a recent planning refusal for a similar scheme on site.

It seemed to be heading in a similar direction again as, prior to our involvement in the project, the applicant had received negative feedback from the planning officer on the latest application.  Fearing a planning refusal and not sure how to most effectively respond to the comments received, we were approached and asked by the applicant to review the case officerโ€™s commentary to date, provide guidance on how best to amend the scheme and to prepare supporting evidence/mitigation measures to help navigate the proposals to a positive outcome.

Key planning considerations for residential development on a brownfield site

 Given the complexities of the space, key planning considerations included:

  • technical requirements (such as parking, and internal room standards);
  • residential amenity considerations;
  • contamination;
  • siting;
  • relationship of the development with neighbouring commercial uses;
  • how the design would respond to local vernacular; and
  • ecological requirements.

We provided the project team with a critical analysis of both the planning policy requirements and the feedback from the officer and weighed this against the proposed development. Our input helped to ensure that the redesign met the technical requirements set out in both local and national policy documents.

Clever design solutions and a strategic planning approach can unlock the development potential of a challenging plot

It was great to be working on the scheme with Edge Design Workshop.  Their considered revisions to the scheme included: removal of a disused MEB building to unlock more of the site; clever design of the housing units to ensure space standards and amenity space requirements were amply met; suitable parking provision for both existing and future residents; design amends to remove the risk of overlooking.

Alongside our advice to the architect, the applicant also commissioned us to write a planning statement, clearly highlighting the previous concerns from the case officer and how these have been addressed in the revised proposal.

The Council remained co-operative throughout the process and ensured a fair assessment of the Site and the revisions undertaken. The result was a positive conclusion, unlocking a valuable brownfield site for the delivery of much needed new homes in Cinderford.

We are so pleased with the outcome, and that through our careful analysis of planning policy and context, effective engagement with the project team and the presentation of a clear and considered planning strategy โ€“ this dilapidated site will now be regenerated to the benefit of the local area and will bring new, stylish apartments to a central and sustainable location.

How we can help

If you have a brownfield site, are wondering about its development potential and would like a member of our team to review your case and explore whether there is a way forward to secure planning approval for your project, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below:

Chris Moore โ€“ Director

T: 01242895008

E: chris.moore@mplanning.co.uk

 

Image source: Edge Design Workshop (2024)

Find out more

Planning secured for 2x family homes near Cirencester following successful Permission in Principle application

McLoughlin Planning has successfully secured Technical Details Consent (TDC) to construct 2 x 4-bed dwellings in the village of Driffield, a non-principal settlement near Cirencester. This is following the successful grant of Permission in Principle (PiP) at Cotswold District Councilโ€™s Planning Committee.

What is Permission in Principle (PiP)?

Permission in Principle is a planning consent route which was introduced in 2018.  It is an alternative way of obtaining planning permission for housing-led development and it separates the consideration of matters of principle for proposed development (location, uses and amount of development), from the technical detail of the of the development (everything else, including planning conditions, s.106 and BNG).

The PiP stage acts like a watered-down outline planning application, and it can prove a useful tool if you want to get a clearer idea of whether development on site may be acceptable in principle, without the need for submitting costly reports from the outset.

The Technical Details Consent is more akin to a full planning application and as such, requires the submission of detailed reports, including full details of layout, scale, landscaping, appearance, and access.

Technical Details Consent (TDC) and Biodiversity Net Gain (BNG)

The most notable aspect of this TDC approval is that off-site Biodiversity Net Gain (BNG) credits needed to be sourced from a third-party organisation. This is because the site was not large enough to achieve the statutory 10% BNG uplift within the site boundary. Once a quote for off-site BNG credits was obtained, this was enough for the Council to grant planning permission, subject to an informative stating that development cannot commence until a BNG Plan has been submitted to and approved by the Council.

This will now be commonplace for small-scale housebuilders and developers as the sites they typically develop will not be large enough to construct dwelling(s) and have sufficient residual space to achieve a 10% BNG uplift on site. Therefore, sourcing off-site BNG credits is now becoming an essential part of obtaining planning permission.

How we can help

Are you looking to obtain planning permission for small-scale residential development? Do you need to source off-site BNG credits for your development? If so, then please contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below.

Joe Seymour โ€“ Associate Director

E:  joe.seymour@mplanning.co.uk

T: 01242 895 121

Project team

  • K-Ten Consulting (Drainage)
  • All Ecology (Ecology)
  • Wotton Tree Consultancy (Arboriculture)
  • Core Geotechnics Ltd (Geology)
  • Andrew P Jones (Development Consultants)

Image Source: Andrew P Jones Associates

 

About us

We are McLoughlin Planning, and our team has a simple objective: to get results for our clients by providing high quality planning consultancy.

Our reputation for integrity, innovation and intelligence means we are a growing business, thriving on personal recommendations from our loyal clients and trusted industry colleagues. Our team of chartered town planning consultants deal with a host of interesting planning projects from across southern England and Wales โ€“ from strategic promotions and commercial premises to private developments and rural projects.

We are a friendly and approachable team who care passionately about the built environment, always striving to get the best outcome for our clients and the community.

Please view our full โ€˜About Usโ€™ page to view which of our planning consultants would best fit your needs.

Find out more

Planning success for state-of-the-art, 66-bed care home in Brockworth, Gloucester

It was an absolute pleasure to be part of this proposal in Brockworth for a three-storey, 66-bed care home facility, along with associated ancillary works. Planning was approved in February of this year.  

The planning balance โ€“ increase in built form outside the settlement boundary VS identified need for housing

The site comprised a single dwelling in ample grounds, surrounded by playing fields and residential gardens with established border treatments.  

Key planning considerations included:  

  • The siteโ€™s location outside the settlement boundary; 
  • The introduction of a larger built form compared to the buildings currently on site; 
  • Access; 
  • Design and layout; 
  • Landscaping and trees;  
  • BNG; 
  • Archaeology;  
  • Energy Strategy. 

Although outside the settlement boundary for Brockworth, the development site benefitted from being adjacent to a strategic allocation, outlined in the Gloucester, Cheltenham and Tewkesbury Joint Core Strategy 2011-2031.  Furthermore, at the time of submission, the Council could not demonstrate a five-year housing land supply. The proposal would therefore help to address the identified need for registered care beds in the locality, and the quantum proposed would make a useful addition to the Councilโ€™s housing supply figures. 

Regarding the increase in built form compared to the existing, whilst this undoubtedly represented a key planning issue, it was successfully evidenced that the scheme could be delivered without unacceptable wider landscape and visual impacts, particularly given the significant additional residential development taking place adjacent to the site. As a result, we successfully justified that the minor visual harm created by the new built form would be comprehensively outweighed by the substantial benefits that would result from the development. 

The importance of communication and collaboration during the planning application process

Given this, a positive pre-application response was received, which acknowledged that the principle of development was acceptable, along with the proposed quantum of development which initially sought an 82-bed care home with associated amenity space, parking provision and a revised access point.   

On this basis, working effectively across a multi-disciplinary project team, a full planning application was submitted. However, statutory consultee responses received during the determination period raised several concerns.  We liaised effectively with the case officer and wider project team, presenting a series of solutions and mitigation measures to assuage concerns and present a scheme which responded positively to statutory responses and ensured a suitable quantum of care provision, adhering to the vision of our client.   

These included:  

  • Reduction in the size of the proposed Care Home to 66 beds; 
  • Revised and reduced building layout  set further back into the site; 
  • Revised parking area to provide a higher proportion of spaces per unit; 
  • Biodiversity Net Gain (BNG) Assessment which demonstrated that a 24.88% BNG would be achieved, far in excess of policy requirements; 
  • Landscape Strategy Plan showing how the BNG will be achieved; 
  • Archaeological Evaluation Report and Trial Trenching results; 
  • Updated Sustainability and Energy Statement confirming that up to 90% of all the care homeโ€™s energy requirements woudl come from renewable energy sources; 
  • Waste Minimisation Statement to ensure the development is carried out in an as environmentally friendly way as possible. 

The application was decided at Planning Committee, and we are delighted that following our involvement, all concerns raised by the statutory consultees were successfully resolved and that planning was approved in a timely manner.    

How we can help

We are McLoughlin Planning, and our team has a simple objective: to get results for our clients by providing high quality planning consultancy. 

Our team of chartered town planning consultants deal with a host of interesting planning projects from across southern England and Wales โ€“ from strategic promotions and commercial premises to private developments and rural projects. 

We are a friendly and approachable team who care passionately about the built environment, always striving to get the best outcome for our clients and the community. 

If you have a development project which would benefit from expert planning consultancy input, then feel free to contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below. 

Joe Seymour โ€“ Associate Director 

E:  joe.seymour@mplanning.co.uk 

T: 01242 895 121 

Project team:  

  • Supporting plans by RDT 
  • Landscape and Visual Appraisal by David Archer Associates 
  • Design and Access Statement by RDT 
  • Transport Statement by RGP 
  • Heritage Statement by Orion 
  • Arboriculture Impact Assessment by David Archer Associates 
  • Ecological Report by Ecology Solutions 
  • Housing Needs Assessment by HPC 
  • Acoustics by Sharpes Redmore 
  • FRA & Drainage by PJA 

Image source: LNT Construction 

Find out more

Striving to set a new standard for the delivery of affordable housing โ€“ 13x highly sustainable homes in the Cotswolds

McLoughlin Planning has secured planning approval for 13x affordable homes with associated works on land to the north of Down Ampney, near Cirencester at Planning Committee.  The proposed development will deliver much-needed housing on an allocated parcel of land within the Cotswold District Council Local Plan and inside a defined settlement boundary.  The approved scheme is a high-quality, considered and sensitively designed residential development which strives to set a โ€œnew standardโ€ for the delivery of affordable housing.  These homes will be among the most energy efficient to be built in the district in recent years, in accordance with the Government and Councilโ€™s climate action ambitions.  

Responding positively to local housing need with a future-proof development

The proposed development will provide 100% affordable housing in an area where there is high demand. The housing mix directly responds to an identified need for the provision of smaller family homes in the area and, as a result, a mix of 2x and 3x bedroom homes will be developed.  

The project team worked rigorously through technical analysis and feedback from community engagement exercises, to ensure that the final scheme successfully responded to existing site constraints and opportunities. In addition, the development seeks to set a โ€œnew standardโ€ for the delivery of affordable housing, with a fabric-first approach to ensure the project meets its target of being highly sustainable.  

The scheme will also provide the following benefits: 

  • A new public open space to the south of the site, providing a mix of green spaces and a childrenโ€™s play area; 
  • A wildflower community meadow to provide a Biodiversity Net Gain (BNG); 
  • Additional tree planting to the front of the proposed properties and across the public realm. 

Bringing a redundant site back into use through responsive housing development

Furthermore, the site itself was once used for garaging and car parking but is now overgrown and fenced off from public use.  These proposals will enable the sustainable use of a redundant site, in a location that is within the development boundary.    

This policy compliant scheme in a sustainable location will deliver on the Local Planโ€™s development allocation and provide much-needed new affordable housing in Down Ampney. The aspiration is to set a new standard of build quality for affordable housing, with the development seeking to provide holistic renewable energy solutions to support low energy costs. This visionary development builds on a collaboration agreement between Bromford and Cotswold District Council to facilitate the development of sustainable, affordable homes in the area. 

It was great to work with  Bromford Housing Association on this project, with excellent architectural vision from Ridge and Partners Architects and landscape and ecological input from EDP.  We thank Cotswold District Council, its elected members, and consultees for their thoughtful response to this considered, needed, and well-designed affordable housing scheme which has community at its heart.   

How we can help

We are McLoughlin Planning, and our team has a simple objective: to get results for our clients by providing high quality planning consultancy.  

Our team of chartered town planning consultants deal with a host of interesting planning projects from across southern England and Wales โ€“ from strategic promotions and commercial premises to private developments and rural projects.  

We are a friendly and approachable team who care passionately about the built environment, always striving to get the best outcome for our clients and the community.  

If you have a development project which would benefit from expert planning consultancy input, then feel free to contact us through either our โ€œArrange a Callโ€ tab on our contact page or via the email and telephone number provided below. 

Chris Moore โ€“ Director 

E: chris.moore@mplanning.co.uk 

T: 01242 895008 

 

Project Team:  

  • Bromford Housing Association  
  • Ridge and Partners (Architecture and Drainage) 
  • EDP (Ecology and Arboriculture)  

 

Image Source: Ridge and Partners (2024)  

Find out more

Appeal for 45 Homes in Gotherington

Nathan McLoughlin and  Joe Seymour worked with the team of consultants that has successfully secured full planning permission, at appeal,  for 45 new homes at Gotherington on behalf of Lioncourt Strategic Land Limited.

This Appeal Decision is noteworthy because it led to confirmation that Tewkesbury Borough Council (TBC) cannot demonstrate a 5-year housing land supply; the best estimate of its housing supply is judged to be 3.39 years. This leaves the Council in a difficult position, which originates from its failure (as part of the Joint Core Strategy (JCS)) to undertake the immediate review that it promised in return for the JCSโ€™s adoption over 5 years ago. This is compounded by the fact that the JCS review process is a number of years away from being resolved. So, there is no easy fix without more speculative applications and/or the long-delayed strategic housing sites coming forward.

However, 5-year supply is only one part of the case for a planning proposal, it is essential that there is a well-designed and reasoned scheme, which fits with the principles of development in the NPPF and the Development Plan. Working closely with the wider team Nathan and Joe explored the previous Appeal and the sensitive landscape issues which affected it. A detailed analysis of the state of the community facilities and services in the village was undertaken to demonstrate that contrary to the Councilโ€™s position, the development would not lead to social cohesion issues.

The Inspector at this appeal made remarks on TBCs development plan that were significantly damaging to this and any future counter-argument, the council might have,  against developments in Tewkesbury District;  the โ€œmost importantโ€ policies in the development plan were deemed to be out-of-date by the Inspector and paragraph 11 d(ii) of the Framework was held to apply. In addition, the Inspector judged that Policy SP2โ€™s numerical limits on housing development in service village locations were for making allocations and not determining applications.

In paragraph 158 of the Decision, the inspector states:

โ€œIn my view, it is of central importance to keep in mind that housing is occupied by people. Dealing with numbers obscures that. The lack of a sufficient forward pipeline of deliverable housing sites will inevitably mean that the housing needs of many people will not be met.โ€ 

This is why the team at McLoughlin Planning do what they do, we care about creating enough homes for everyone.

Nathan McLoughlin was the lead planning witness, Joe Seymour provided support and great skill in assembling and running the Appeal. The wider team included fellow witnesses Cameron Austin-Fell (RPS), and Mike Davies (Davies Landscape Architecture), overseen by Peter Goatley KC on behalf of Vicky Bilton and Andy Faizey at Lioncourt.

Find out more

About us

We have a simple objective: to get results for our clients by providing high quality planning consultancy. That means our goal is to secure planning permission or an allocation for development.

Get in touch

If you are interested in finding out how we can help you please get in touch