Our Work

Our reputation for integrity and the respect we have gained means we are a growing business, thriving on personal recommendations from our loyal clients and trusted industry colleagues. Our team of town planning consultants deal with a host of interesting planning projects from across southern England and Wales.

Take a look at a few examples of our work

Team members gathered around a laptop

New Garden Centre and Cafe

McLoughlin Planning is pleased to have secured planning permission for the extension and alteration to an existing Garden Centre, the erection of a new Commercial Storage Building and a new on-site cafeฬ in South Gloucestershire.

As a result of Enforcement Action being taken against the landowner, we were engaged to review the propertyโ€™s planning history and the alleged breaches in the enforcement notice to provide a planning strategy to regularise the use of the site. The property had a long and complex planning history, but following a detailed assessment, we managed to establish that the lawful use of the site was a Garden Centre.

As the enforcement notice had taken effect by the time of our instruction, we advised the landowner to comply with the notice. In parallel, we worked with the landowner on preparing a planning application which would allow the lawful business to diversify and secure the necessary on-site secure storage needed for the businessโ€™s products and equipment.

Without on-site improvements, the landowner would have been left with a small structure to display goods, and shipping containers to the rear to act as storage for goods and equipment. We made the case that the proposal would allow for the visual enhancement of the proposal site and would support the growth of a rural enterprise by providing a high-end cafeฬ and garden centre as an alternative shopping option to the adjacent Dobbies Garden Centre.

With close work with the Council, we were able to proactively resolve any queries regarding the development. For example, concerns were raised about whether the business would harm the neighbouring Dobbies Garden Centre; for which we were able to demonstrate that the offering at this business is aimed at a different audience to Dobbies. We were also able to agree with the Council means to secure on-site improvements, such as EV charging, new vehicle hardstanding, and cycle parking.

We are thrilled that the landowner has secured planning permission for a well-designed and high-end Garden Centre and Cafeฬ. Given the importance small businesses play for the economy, particularly in rural areas, we are pleased that we were able to support the retention and growth of a valuable business in South Gloucestershire. It was a pleasure working alongside Southpoint Architects who were leading on the design.

Find out more

Repurpose of Church grounds

We have recently been successful on application in using PiP to secure Permission in Principle for up to 5 dwellings on the site of a 1960s building last used as a Catholic Church.

Despite the site being located within the settlement boundary for Bourton-on-the-Water, McLoughlin Planning were initially met with resistance from Cotswold District Council to the prospect of redeveloping the brownfield site for a residential use. The building was previously used by the Diocese of Clifton for Catholic services, these were now mainly being conducted from their church in Stow-on-the-Wold, which meant the site was surplus to requirements.

Being faced with a refusal, McLoughlin Planning had to provide additional justification to comply with Policy INF2 which governs the redevelopment of community facilities such as places of worship. We explained that not only was there a suitable alternative venue in a nearby settlement that was more popular with the churchโ€™s congregation, but there are similar community facilities in the same planning use class within Bourton-on-the-Water that could perform the same services.

The Council requested a marketing exercise to prove there was no demand for the use of the site, however we successfully argued that this was not a policy requirement, because this only applied to the loss of a shop or pub. Consequently, McLoughlin Planning was able to demonstrate full compliance with Policy INF2 and the application was subsequently permitted.

This example further serves to demonstrate the usefulness of PiP Applications for private clients in providing highly cost-effective solutions to determine the development potential of their land and secure an uplift in value.

If this were a conventional outline or detailed application, upfront costs would have been considerably higher, reflecting the need for more technical work. Whereas, with the PiP process, the costs are largely focused on the planning case for the development, allowing significant savings to be made.

Find out more

Roof Terrace Alterations

McLoughlin Planning is pleased to have helped a homeowner in the London Borough of Camden in securing planning permission for amendments and improvements to an existing roof terrace space.

The existing property had a centrally located roof outbuilding which housed a staircase leading up to the outdoor space. However, the structure leaked both heat and rain due to historically poor construction. Furthermore, its central location meant the outdoor space could not be used to its full advantage.

As the property is also located in a conservation area, care was taken to ensure the proposal would also find ways to visually reduce its impact on the street scene and support the visual interest of the historically significant surrounding built form.

Working closely with the architect the initial proposal sought to move the stair opening to the southern edge of the building to provide a modern interpretation of the existing outbuilding which would visually reduce its built form and architecturally provide a distinction between the historic and modern built form. The scheme also includes an air source heat pump to help improve the propertyโ€™s energy efficiency and overall sustainability.

Unfortunately, the Council raised concerns during the application about the overall design and height of the proposed cover and that this would likely be refused. Despite efforts to demonstrate how the structure complied with planning policies and would not result in the alleged harm, the Councilโ€™s position remained too far apart from the applicants to reach a suitable comprise on the design presented. However, in the interest of securing planning permission and a functional alternative, we worked with the architect to address the Councilโ€™s objections and proposed an amended opening with shared visual similarities to a Velux window. This would also help provide further access to sunlight/daylight internally.

The Council agreed that the amended proposal addressed their concerns and planning permission has now been granted. We are pleased that working proactively with the Council, architect, and the applicant meant a solution could be presented, providing a more aesthetically pleasing and functional outdoor space in time for the summer!

 

Find out more

Self-Build Replacement Dwelling in the Green Belt

Following a lengthy proactive negotiation process with Tewkesbury Borough Council, we are pleased to have secured planning permission for a beautiful new self-build replacement dwelling on the doorstep of Cheltenham Racecourse.

Our client approached us with a planning application which sought to replace a post-war rendered bungalow with a new highly sustainable and beautifully designed 1.5 storey timber cladded family home.

Whilst the Council supported the design and agreed that it was high quality, there was a debate due to the proposed size of the new dwelling versus the existing home and what impact this change would have on the Green Belt and wider countryside. Concern was raised particularly in regard of the increase in ridge height.

Working closely with the applicant, we made a case on how the careful highly sustainable design responded to its context to ensure impact on the Green Belt remained very localised. Furthermore, the introduction of Class AA permitted development rights allowing the extension upwards (in addition to other PD rights), enabled us to demonstrate that the fallback position would result in a proposal which would be larger and result in greater harm than the current scheme.

We also emphasised the Governmentโ€™s push to support new self-build development which has become an increasingly important planning consideration with recent recommendations coming through the Bacon Review (see our recent article on self-build here https://mplanning.co.uk/news/2โ€ฆ).

Working closely with the case officer it was agreed that the proposal would provide a scheme which would comply with Green Belt policy requirements. Furthermore, working closely with the officer, we were able to reduce the number of planning conditions to help ensure the swift delivery of the development.

This is a great case study on the importance of considering your available fallback positions, including development sites in the Green Belt, and taking the time to adopt a well-considered design approach and planning strategy.

We are delighted that we could be part of the applicantโ€™s journey in securing their new family home and believe it will provide a new attractive addition to the Cheltenham area โ€“ particularly for those passing to attend the Cheltenham races!

Find out more

St Pauls Medical Centre

Weโ€™re delighted to have secured planning approval for a new state-of-the-art medical centre to provide a new base for the existing St Paulโ€™s Surgery, in St Paulโ€™s Road, Smethwick.

The medical centre includes 10 consulting rooms, five treatment rooms, a Minor Ops suite, staff room, meeting room, central waiting space and administration rooms. Forty parking spaces are to be provided, including three disabled spaces and a drop off and deliveries bay.

Our comprehensive design and access statement commented that โ€œSt Paulโ€™s Surgery currently occupies a two storey building that is outdated, under sized and no longer fit for purpose to accommodate the growing patient numbers in Smethwick and the surrounding area.

It is not practical to enhance or extend the existing building, and with limited space there is no ability to meet the increased demand for routine and urgent care.

In order to continue to provide services to all patients the practice must relocate and expand.

By relocating to the new site, patients will benefit from improved privacy and dignity arrangements; a fit for purpose building for the growing practice; patient centred care in a modern, purpose built environment, whilst accommodating the practiceโ€™s growing needs; improved disabled access; improvement in staff working conditions; increased car parking provision for both staff and patients; a wider range of enhanced primary care services; and provision of on-site pharmacy services integrated with the practice in terms of working process and delivery.

Services normally provided in a hospital or other local clinics could be provided at the new building freeing up facilities for more specialist procedures and improving healthcare capacity. We have included a Minor Ops suite to support some of these services.

A โ€œpandemic wingโ€ has been included in the surgery, with the option to isolate some rooms from the rest of the building, and with separate access for patients and staff.

There is an established need for St Paulโ€™s surgery to expand. The existing premises are over capacity with no ability to extend.

Providing the surgery with a new, purpose built building, will allow them to not only improve routine clinical services but also offer a wide range of integrated services for patients and local community.

The layout of the building is designed to make it easy to navigate for both patients and staff, while creating a space that is enjoyable to work in and pleasant to visit. The central location of the site is ideal for a new medical centre, with established public transport links.โ€

Find out more

About us

We have a simple objective: to get results for our clients by providing high quality planning consultancy. That means our goal is to secure planning permission or an allocation for development.

Get in touch

If you are interested in finding out how we can help you please get in touch